Public Infrastructure

LOD 350 with Structural BIM Modeling & 4D Simulation

LOD 350 structural BIM modeling with 4D simulation and quantity take-off for a road infrastructure project.

Road infrastructure structural BIM modeling project
Overview

Project Overview

This road infrastructure project required LOD 350 structural BIM modeling with integrated 4D simulation and quantity take-off. Our team developed detailed structural models supporting construction sequencing and cost planning.

The deliverables enabled the client to visualize construction phasing and extract accurate quantities from the coordinated 3D model.

Level of Development LOD 350
Discipline Structural
Location Road Infrastructure
Project Type Public Infrastructure
LOD 350 road infrastructure BIM model
Tools We Use

Inside the Tools You Already Use

Structural BIM modeling, 4D simulation, and quantity take-off ran in Autodesk Revit and Navisworks.

RevitRevit
NavisworksNavisworks
Project Deliverables

Input vs Output

From structural design inputs to LOD 350 models with 4D simulation and quantity take-off data.

What We Received

  • Structural engineering drawings
  • Road alignment and survey data
  • Construction schedule baseline
  • Material specifications and standards

What We Delivered

  • LOD 350 3D model
  • 4D simulation
  • Quantity take-off
Get A Free Quote
Client Challenges

Pain Points of the Client

Road infrastructure projects require coordinated structural models with sequencing and quantity intelligence.

01

Complex Infrastructure Geometry

Road and bridge structures involve complex geometry requiring detailed LOD 350 modeling.

02

Construction Sequencing Visibility

Infrastructure projects benefit from 4D simulation to visualize phasing and identify conflicts.

03

Quantity Accuracy for Procurement

Large infrastructure volumes demand precise quantity take-offs from coordinated models.

04

Multi-Phase Construction Planning

Road projects span extended timelines requiring schedule-linked BIM deliverables.

Our Approach

How We Solved It

LOD 350 structural modeling with 4D simulation integration and quantity take-off extraction.

LOD 350 Structural Modeling

Developed detailed structural BIM models in Revit at LOD 350.

4D Simulation Development

Linked structural models to construction schedules for 4D phasing simulation in Navisworks.

Quantity Take-Off

Extracted accurate quantities from the coordinated model for cost and procurement planning.

Coordinated Delivery

Validated models, simulations, and quantity data against project requirements before delivery.

Execution Strategy

A Structured Infrastructure Workflow - Phase by Phase

Delivery progressed from design intake through structural modeling, 4D simulation, and quantity extraction.

  1. Design Intake and Scope Alignment

    Design Intake and Scope Alignment

    01
    01

    Design Intake and Scope Alignment

    Design Intake and Scope Alignment

  2. 02

    LOD 350 Structural BIM Modeling

    LOD 350 Structural BIM Modeling

    02

    LOD 350 Structural BIM Modeling

    LOD 350 Structural BIM Modeling

  3. Construction Schedule Integration

    Construction Schedule Integration

    03
    03

    Construction Schedule Integration

    Construction Schedule Integration

  4. 04

    4D Simulation Development

    4D Simulation Development

    04

    4D Simulation Development

    4D Simulation Development

  5. Quantity Take-Off Extraction

    Quantity Take-Off Extraction

    05
    05

    Quantity Take-Off Extraction

    Quantity Take-Off Extraction

  6. 06

    Final Review and Delivery

    Final Review and Delivery

    06

    Final Review and Delivery

    Final Review and Delivery

Project Outcomes

Coordinated. Approved. Delivered.

LOD 350 structural model with 4D simulation and quantity take-off delivered for road infrastructure.

LOD 350 3D Model

Detailed structural BIM model developed at LOD 350.

4D Simulation

Construction phasing simulation linking model elements to schedule activities.

Quantity Take-Off

Accurate quantity data extracted from the coordinated model for planning.