Public Infrastructure

LOD 400 ACS & MEPF Modeling with Shop Drawings & Clash Detection & Coordination

LOD 400 mechanical, electrical, plumbing, and fire protection modeling with inter-discipline clash detection, shop drawings, and fabrication drawings for a defence institute.

Defence institute MEPF BIM modeling project
Overview

Project Overview

This defence institute project required LOD 400 MEPF models across mechanical, electrical, plumbing, and fire protection systems with inter-discipline clash detection and coordination. Our team delivered coordinated models along with shop and fabrication drawings.

The deliverables supported installation planning and fabrication with accurate, coordinated drawing sets derived from the LOD 400 BIM models.

Level of Development LOD 400
Discipline MEPF
Location Defence Institute
Project Type Public Infrastructure
LOD 400 MEPF coordinated model defence institute
Tools We Use

Inside the Tools You Already Use

MEPF modeling, clash detection, and drawing production ran in Autodesk Revit and Navisworks.

RevitRevit
NavisworksNavisworks
Project Deliverables

Input vs Output

From MEPF design inputs to LOD 400 coordinated models, shop drawings, and fabrication drawings.

What We Received

  • MEPF design drawings and specifications
  • Architectural and structural reference models
  • Equipment schedules and layout data
  • Client BIM standards and templates

What We Delivered

  • LOD 400 mechanical, electrical, plumbing, and fire protection models
  • Inter-discipline clash detection and coordination
  • Shop drawings
  • Fabrication drawings
Get A Free Quote
Client Challenges

Pain Points of the Client

Defence institute facilities require precise MEPF coordination and fabrication-ready documentation.

01

LOD 400 MEPF Detail Requirements

Institutional MEPF systems require detailed LOD 400 models for installation and fabrication.

02

Inter-Discipline Coordination

Mechanical, electrical, plumbing, and fire protection systems must coordinate without conflicts.

03

Shop and Fabrication Drawing Accuracy

Installation and fabrication depend on drawing sets that precisely reflect the coordinated model.

04

Institutional System Complexity

Defence facilities involve specialized MEPF systems with stringent coordination requirements.

Our Approach

How We Solved It

LOD 400 MEPF modeling with clash detection, coordination, and shop/fabrication drawing production.

LOD 400 MEPF Modeling

Developed mechanical, electrical, plumbing, and fire protection models at LOD 400 in Revit.

Inter-Discipline Clash Detection

Ran federated clash tests across all MEPF disciplines using Navisworks.

Shop Drawing Production

Extracted shop drawings from coordinated models for installation planning.

Fabrication Drawing Delivery

Produced fabrication-ready drawing sets aligned with the coordinated BIM model.

Execution Strategy

A Structured MEPF Workflow - Phase by Phase

Delivery progressed from design intake through MEPF modeling, clash detection, and drawing production.

  1. MEPF Design Intake and Standards Alignment

    MEPF Design Intake and Standards Alignment

    01
    01

    MEPF Design Intake and Standards Alignment

    MEPF Design Intake and Standards Alignment

  2. 02

    LOD 400 MEPF Discipline Modeling

    LOD 400 MEPF Discipline Modeling

    02

    LOD 400 MEPF Discipline Modeling

    LOD 400 MEPF Discipline Modeling

  3. Inter-Discipline Clash Detection

    Inter-Discipline Clash Detection

    03
    03

    Inter-Discipline Clash Detection

    Inter-Discipline Clash Detection

  4. 04

    Coordination and Issue Resolution

    Coordination and Issue Resolution

    04

    Coordination and Issue Resolution

    Coordination and Issue Resolution

  5. Shop and Fabrication Drawing Production

    Shop and Fabrication Drawing Production

    05
    05

    Shop and Fabrication Drawing Production

    Shop and Fabrication Drawing Production

  6. 06

    Final Review and Delivery

    Final Review and Delivery

    06

    Final Review and Delivery

    Final Review and Delivery

Project Outcomes

Coordinated. Approved. Delivered.

LOD 400 MEPF models with clash detection, shop drawings, and fabrication drawings delivered.

LOD 400 MEPF Models

Mechanical, electrical, plumbing, and fire protection models at LOD 400.

Inter-Discipline Clash Detection and Coordination

Conflicts identified and resolved across all MEPF disciplines.

Shop Drawings

Installation-ready shop drawing sets extracted from coordinated models.

Fabrication Drawings

Fabrication-ready drawing sets aligned with the BIM model.