Data Center

BIM Coordination for a Large-Scale Mission-Critical Data Center in Malaysia

Managed BIM coordination for a 235,750 sq. ft. highly services-intensive data center, integrating complex mechanical, electrical, plumbing, fire protection, and ICT systems.

Get A Free Quote
BIM coordination for a large-scale mission-critical data center in Malaysia
Overview

Project Overview

A 235,750 sq. ft. data center development spanning 10.3 hectares of land in Malaysia required comprehensive BIM support to coordinate its highly complex building systems. With extensive mechanical, electrical, plumbing, fire protection, and ICT infrastructure, the project demanded meticulous multi-discipline coordination to ensure constructability and operational reliability.

Over a two-year engagement, our team delivered coordinated Architectural, Structural, and MEP BIM models, custom Revit families, shop drawings, and clash-free project documentation to support efficient construction execution.

Project Type Data Center
Level of Development LOD 350
Project Area 235,750 Sq.Ft.
Manpower Used 10 Resources
Location Malaysia
Coordinated BIM output for Malaysia data center
Tools We Use

Inside the Tools You Already Use

Coordination ran in Autodesk Revit and Navisworks across a two-year mission-critical data center engagement.

Autodesk RevitAutodesk Revit
NavisworksNavisworks
Project Deliverables

Input vs Output

From dense MEP references to coordinated models, custom families, shop drawings, and clash-free documentation.

What We Received

  • Architectural design references
  • Structural layout drawings
  • MEP, ICT, and utility schematics
  • Equipment schedules and specifications
  • LOD 350 modeling standards

What We Delivered

  • Architectural BIM model
  • Structural BIM model
  • MEP BIM model
  • Custom Revit families
  • Shop drawings and clash-free documentation
Get A Free Quote
Client Challenges

Pain Points of the Client

Mission-critical density, massive site scale, and specialized systems created severe coordination pressure across the full project lifecycle.

01

Intense MEP-Heavy Infrastructure

Dense MEP, ICT, and utility systems required precise routing and continuous multi-discipline coordination.

02

Massive Scale and Footprint

Coordinating building systems across a 10.3-hectare site demanded meticulous planning and model management.

03

Integration of Specialized Systems

Water treatment, chemical dosing, and cooling systems required seamless integration within constrained spaces.

04

High-Stakes Equipment Density

Extensive mechanical and electrical equipment layouts demanded exceptional accuracy to minimize construction risks.

05

High Density of MEP Systems

Extensive routing of chilled water, electrical, fire protection, ICT, and plumbing services created severe coordination challenges.

06

Complex Mechanical Infrastructure

ACMV systems, water treatment systems, and cooling networks required detailed modeling and coordination.

07

Electrical System Complexity

Major electrical equipment, earthing systems, lighting networks, and BMS integrations increased model complexity.

08

Clash Detection at Scale

Coordinating Architecture, Structure, and multiple MEP trades required continuous clash analysis and issue resolution.

Our Approach

How We Solved It

A structured BIM workflow with regular clash detection ensured seamless integration of all critical building systems.

Architectural BIM Modeling

Developed coordinated architectural models aligned with the 10.3-hectare data center site and building envelope.

Structural BIM Modeling

Built structural models to support dense MEP routing and equipment placement across the facility.

MEP BIM Modeling

Modeled mechanical, electrical, plumbing, fire protection, and ICT systems with LOD 350 precision.

Revit Family Creation

Created and maintained hundreds of specialized equipment families required for accurate data center modeling.

Shop Drawings Development

Produced shop drawings from coordinated models to support construction execution.

Clash Detection & Reporting

Ran continuous clash analysis across all trades with documented issue tracking and resolution.

BIM Coordination

Maintained multi-discipline coordination across a two-year engagement with strict quality control.

Execution Strategy

Structured BIM Workflow for Mission-Critical Delivery

We implemented a structured BIM workflow focused on accuracy and coordination. Regular clash detection prevented costly conflicts. The approach ensured seamless integration of all critical building systems.

  1. Model Setup and BIM Standards Alignment

    Model Setup and BIM Standards Alignment

    01
    01

    Model Setup and BIM Standards Alignment

    Model Setup and BIM Standards Alignment

  2. 02

    Architectural and Structural Modeling

    Architectural and Structural Modeling

    02

    Architectural and Structural Modeling

    Architectural and Structural Modeling

  3. MEP and ICT System Modeling

    MEP and ICT System Modeling

    03
    03

    MEP and ICT System Modeling

    MEP and ICT System Modeling

  4. 04

    Revit Family Development

    Revit Family Development

    04

    Revit Family Development

    Revit Family Development

  5. Clash Detection and Issue Resolution

    Clash Detection and Issue Resolution

    05
    05

    Clash Detection and Issue Resolution

    Clash Detection and Issue Resolution

  6. 06

    Shop Drawing Production and Final Delivery

    Shop Drawing Production and Final Delivery

    06

    Shop Drawing Production and Final Delivery

    Shop Drawing Production and Final Delivery

Project Outcomes

Coordinated. Approved. Delivered.

Project outcomes that reduced risks, improved constructability, and enhanced delivery confidence.

4x Cost Saving

Dedicated offshore BIM coordination reduced delivery cost across the two-year data center engagement.

90% On-time Delivery

Coordinated models and documentation were delivered on schedule across structured project milestones.

95% Project Efficiency

Continuous clash cycles and disciplined model management kept a ten-person team productive at scale.

99% Quality Assurance

LOD 350 compliance and quality control were maintained throughout the project lifecycle.