Commercial Building

LOD 400 ACS & MEPF Modeling with Clash Detection & Coordination

LOD 400 architectural, structural, and MEPF modeling with clash detection, 4D simulation, construction scheduling, and comprehensive construction documents for a commercial tower.

Commercial tower ACS and MEPF BIM modeling
Overview

Project Overview

This commercial tower project required LOD 400 models across architectural, structural, and MEPF disciplines with integrated clash detection and coordination. Our team delivered coordinated models, clash reports, construction scheduling, and 4D simulation outputs.

Comprehensive construction documents were produced alongside the coordinated BIM deliverables to support the tower's construction phase.

Level of Development LOD 400
Discipline ACS & MEPF
Location Commercial Tower
Project Type Commercial Building
Coordinated commercial tower BIM model
Tools We Use

Inside the Tools You Already Use

Multi-discipline modeling, clash detection, and 4D simulation ran in Autodesk Revit and Navisworks.

RevitRevit
NavisworksNavisworks
Project Deliverables

Input vs Output

From design inputs to LOD 400 coordinated models, clash reports, 4D simulations, and construction documents.

What We Received

  • Architectural, structural, and MEPF design drawings
  • Client BIM execution plan and standards
  • Consultant reference models
  • Construction schedule baseline data

What We Delivered

  • LOD 400 architectural, structural, and MEPF models
  • Clash detection and coordination reports
  • Construction scheduling and project tracking reports
  • 4D simulation videos and presentations
  • Comprehensive construction documents
Get A Free Quote
Client Challenges

Pain Points of the Client

High-rise commercial towers demand precise multi-discipline coordination and construction-ready documentation.

01

Multi-Discipline LOD 400 Complexity

Architectural, structural, and MEPF systems in a tower require detailed LOD 400 models across all trades.

02

Vertical Shaft and Core Coordination

Elevator, stair, and MEP shaft routing in tall buildings creates dense clash zones requiring systematic detection.

03

4D Schedule Integration

Construction sequencing for towers must be linked to BIM models for effective 4D simulation.

04

Construction Document Completeness

Tower projects require comprehensive, coordinated construction documents aligned with BIM models.

Our Approach

How We Solved It

Integrated ACS and MEPF modeling with clash detection, 4D simulation, and construction document production.

LOD 400 Multi-Discipline Modeling

Developed architectural, structural, and MEPF models at LOD 400 in Revit.

Clash Detection and Reporting

Ran federated clash tests in Navisworks and produced coordination reports for resolution.

4D Simulation and Scheduling

Linked BIM models to construction schedules for 4D simulation videos and tracking reports.

Construction Document Production

Produced comprehensive construction documents aligned with coordinated BIM deliverables.

Execution Strategy

A Structured Tower Workflow - Phase by Phase

Delivery moved from scope alignment through multi-discipline modeling, clash detection, 4D simulation, and document production.

  1. Scope Briefing and Tool Alignment

    Scope Briefing and Tool Alignment

    01
    01

    Scope Briefing and Tool Alignment

    Scope Briefing and Tool Alignment

  2. 02

    LOD 400 ACS & MEPF Modeling

    LOD 400 ACS & MEPF Modeling

    02

    LOD 400 ACS & MEPF Modeling

    LOD 400 ACS & MEPF Modeling

  3. Clash Detection and Coordination

    Clash Detection and Coordination

    03
    03

    Clash Detection and Coordination

    Clash Detection and Coordination

  4. 04

    4D Simulation and Scheduling

    4D Simulation and Scheduling

    04

    4D Simulation and Scheduling

    4D Simulation and Scheduling

  5. Construction Document Production

    Construction Document Production

    05
    05

    Construction Document Production

    Construction Document Production

  6. 06

    Final Review and Delivery

    Final Review and Delivery

    06

    Final Review and Delivery

    Final Review and Delivery

Project Outcomes

Coordinated. Approved. Delivered.

LOD 400 coordinated models, clash reports, 4D simulations, and construction documents delivered for the commercial tower.

LOD 400 ACS & MEPF Models

Architectural, structural, and MEPF models developed at LOD 400.

Clash Detection and Coordination Reports

Interdisciplinary clashes identified and documented for resolution.

Construction Scheduling and Project Tracking

Schedule-linked reports supporting construction planning and tracking.

4D Simulation Videos and Presentations

Visual simulations linking BIM models to construction sequencing.

Comprehensive Construction Documents

Complete construction document sets aligned with coordinated BIM models.

Contact Us

Get in Touch

Let's discuss your requirements and see how our expertise can help on your next project.