Residential Building

CAD to BIM with LOD 350

CAD to BIM conversion at LOD 350 with clash detection, interdisciplinary coordination, and construction scheduling support for a residential building project.

Residential CAD to BIM conversion project
Overview

Project Overview

This residential project required converting existing CAD documentation into a coordinated LOD 350 BIM model. Our team developed architectural and discipline models with clash detection and interdisciplinary coordination throughout.

Construction scheduling and project tracking were integrated into the delivery workflow to support the client's construction planning needs.

Level of Development LOD 350
Discipline Multi-Discipline
Location USA
Project Type Residential Building
LOD 350 coordinated residential BIM model
Tools We Use

Inside the Tools You Already Use

CAD to BIM conversion and coordination ran in Autodesk Revit and Navisworks across the project lifecycle.

RevitRevit
NavisworksNavisworks
Project Deliverables

Input vs Output

From 2D CAD drawings to coordinated LOD 350 BIM models with clash-free interdisciplinary coordination.

What We Received

  • 2D CAD architectural and discipline drawings
  • Design specifications and standards
  • Client BIM execution plan
  • Reference models from consultants

What We Delivered

  • CAD to BIM conversion
  • LOD 350 BIM model
  • Clash detection
  • Interdisciplinary coordination
  • Construction scheduling and project tracking
Get A Free Quote
Client Challenges

Pain Points of the Client

Residential projects converting from CAD to BIM face coordination gaps and schedule pressures that structured BIM delivery addresses.

01

Legacy CAD Documentation Gaps

Existing 2D drawings often lack the coordination detail needed for modern construction workflows.

02

Multi-Discipline Coordination

Architectural, structural, and MEP systems must align in a single coordinated model at LOD 350.

03

Clash Prevention Before Construction

Undetected conflicts between disciplines can cause costly field rework on residential builds.

04

Schedule and Tracking Integration

Construction teams need BIM models linked to scheduling and tracking for effective project control.

Our Approach

How We Solved It

CAD to BIM conversion followed by LOD 350 modeling, clash detection, and coordinated delivery.

CAD to BIM Conversion

Converted 2D CAD documentation into structured Revit models following client standards.

LOD 350 Model Development

Built coordinated discipline models at LOD 350 with accurate element representation.

Clash Detection and Coordination

Ran federated clash tests and resolved interdisciplinary conflicts through Navisworks.

Scheduling and Tracking Support

Integrated construction scheduling and project tracking into the BIM delivery workflow.

Execution Strategy

A Structured CAD to BIM Workflow - Phase by Phase

Delivery moved from CAD intake through BIM conversion, LOD 350 modeling, clash detection, and final coordination.

  1. CAD Intake and Standards Review

    CAD Intake and Standards Review

    01
    01

    CAD Intake and Standards Review

    CAD Intake and Standards Review

  2. 02

    CAD to BIM Conversion

    CAD to BIM Conversion

    02

    CAD to BIM Conversion

    CAD to BIM Conversion

  3. LOD 350 Model Development

    LOD 350 Model Development

    03
    03

    LOD 350 Model Development

    LOD 350 Model Development

  4. 04

    Clash Detection and Coordination

    Clash Detection and Coordination

    04

    Clash Detection and Coordination

    Clash Detection and Coordination

  5. Construction Scheduling Integration

    Construction Scheduling Integration

    05
    05

    Construction Scheduling Integration

    Construction Scheduling Integration

  6. 06

    Final Model Review and Delivery

    Final Model Review and Delivery

    06

    Final Model Review and Delivery

    Final Model Review and Delivery

Project Outcomes

Coordinated. Approved. Delivered.

A coordinated LOD 350 residential BIM model with clash detection and scheduling support delivered from CAD inputs.

CAD to BIM Conversion

Legacy CAD documentation converted into structured, coordinated BIM models.

LOD 350 BIM Model

Discipline models developed at LOD 350 with accurate element representation.

Clash Detection

Interdisciplinary clashes identified and resolved before construction.

Interdisciplinary Coordination

All disciplines aligned in a single federated, clash-free model.

Construction Scheduling and Project Tracking

BIM deliverables integrated with scheduling and tracking workflows.

Contact Us

Get in Touch

Let's discuss your requirements and see how our expertise can help on your next project.