BIM Consulting, Architectural, Structural and MEPF Modeling for a Commercial Tower in India




Brief Overview
VBS was engaged in providing comprehensive BIM consulting services for the construction of a 16-story commercial tower, located at the SEZ, GIFT City, Gujarat. The project aimed to leverage the benefits of Building Information Modeling (BIM) throughout the entire project lifecycle, from initial design to facility management.
Challenges/Requirements
Comprehensive 3D BIM Model Development
Achieving LOD 400
Clash Detection and Coordination


Deliverables
Provide detailed BIM models with LOD 400 for architecture, structure, and MEPF systems.
Generate reports highlighting clashes and coordination issues between different building components.
Provide reports for efficient project management, including construction scheduling and progress tracking.
Create visualizations of the construction sequence through 4D simulation to identify and mitigate potential issues.
Deliver detailed construction documents, including drawings and specifications, for smooth project execution.
Outcomes / Benefits
Improved Coordination and Collaboration
Cost and Time Savings
Accurate Material Estimation and Cost Control
Enhanced Project Visualization
Value Engineering Opportunities
Streamlined Facility Management
A staggering 355 million women and girls are still waiting for a toilet in India (WaterAid, 2017). Women from low-income communities face the brunt of this gap as they compromise their safety each day to carry out their daily sanitation routine.





A staggering 355 million women and girls are still waiting for a toilet in India (WaterAid, 2017). Women from low-income communities face the brunt of this gap as they compromise their safety each day to carry out their daily sanitation routine.





A staggering 355 million women and girls are still waiting for a toilet in India (WaterAid, 2017). Women from low-income communities face the brunt of this gap as they compromise their safety each day to carry out their daily sanitation routine.





A staggering 355 million women and girls are still waiting for a toilet in India (WaterAid, 2017). Women from low-income communities face the brunt of this gap as they compromise their safety each day to carry out their daily sanitation routine.





We’re just a call/email away. Contact us!
Our team is here to support your BIM needs. Let’s initiate a conversation today and unlock the power of coordinated BIM models, and efficient project delivery.